One foundry, every critical step. Our 21,300 m² facility in Zigong includes more than 10,000 m² of workshops, a 2,000 m² office building and a 3,600 m² casting workshop, with an annual casting capacity of 5,000 VMC castings. Keeping pattern making, melting, pouring, heat treatment and testing in-house means fewer hand-offs and a predictable schedule.
Production equipment
Pattern making
- 6 m × 3 m engraving machine and CNC 2D cutter, one each — custom patterns and sample development in 3–7 days.
- CNC forming reduces manual white-model parting and bonding errors, keeping the casting faithful to the drawing.
Coating & drying
- Automatic wet/dry integrated heating equipment with time-controlled temperature and humidity for consistent coating quality.
- Drying racks leveled with an infrared level to prevent pattern deformation during baking.
- Custom turnover racks reduce the chance of pattern damage while coating.
Boxing & sand treatment
- 4 boxing stations — up to 15 machine sets completed per day.
- Two-stage sand reclamation keeps dust content and permeability within technical requirements.
Melting & pouring
- Two 2-tonne medium-frequency induction furnaces operating simultaneously.
- Single-piece pouring capacity up to 5 tonnes; combined daily melting output up to 35 tonnes.
Cleaning & heat treatment
- Shot blasting machines at 2.5 m × 2 m and 3 m × 2.5 m cover most machine tool casting sizes.
- Automatic temperature-controlled annealing furnaces at 3 m × 2 m and 4 m × 3 m.
Other equipment
| Equipment | Specification | Ownership | Qty |
|---|---|---|---|
| Overhead cranes | 5 T, 10 T | Owned | 4 |
| Sand boxes | 1.2–2.5 m, various sizes | Owned | 48 sets |
| Environmental equipment | VOCs treatment | Owned | 1 set |
| Vacuum pump | SZ-2 | Owned | 1 set |
Process simulation
Casting simulation software models filling, solidification and cooling before tooling is cut. By predicting shrinkage, misruns and cold shuts in advance, we optimize gating and riser design and improve first-pass yield on new parts.
“`mermaid
flowchart LR
A[“Customer drawing”] –> B[“Drawing review”]
B –> C[“Process & gating design”]
C –> D[“Simulation”]
D –> E[“CNC pattern making”]
E –> F[“Coating & drying”]
F –> G[“Boxing & sand filling”]
G –> H[“Melting & pouring”]
H –> I[“Shakeout & cleaning”]
I –> J[“Inspection & shipment”]
“`